Agency – L&T Construction Ltd.
Client – National Highways Authority of India.
Projects
Completed Projects
Warning: Invalid argument supplied for foreach() in /home/u259509802/domains/ymwconstro.com/public_html/wp-content/themes/builtpress/vc_templates/st_portfolios.php on line 73
![](https://ymwconstro.com/wp-content/uploads/2018/12/IMG_1027-600x400.jpg)
Effluent drain line (HDPE Pipeline)
![](https://ymwconstro.com/wp-content/uploads/2018/12/IMG_6779-600x400.jpg)
Storm Water Drain Project
![](https://ymwconstro.com/wp-content/uploads/2018/12/jalyukt1-600x400.jpg)
Jalyukt Shivar Works
![](https://ymwconstro.com/wp-content/uploads/2015/11/ymw-paithan--600x400.jpg)
River Front Ghat Paithan
![](https://ymwconstro.com/wp-content/uploads/2015/11/59af49cc5164304a2def53c1e7a7c79c_L-600x400.jpg)
Rotegaon railway station, Aurangabad
![](https://ymwconstro.com/wp-content/uploads/2015/11/3-600x400.jpg)
Minor Bridge on Beed bypass
![](https://ymwconstro.com/wp-content/uploads/2015/11/7-600x400.jpg)
Bridge on Satara to Satara Tanda
![](https://ymwconstro.com/wp-content/uploads/2015/11/564-600x400.jpg)
Irrigation Project in Khargone ,MP
![](https://ymwconstro.com/wp-content/uploads/2015/11/126-600x400.jpg)
Gas Pipeline Project in Manor ,Palghar ,MH.
![](https://ymwconstro.com/wp-content/uploads/2015/11/ymw-123-600x400.jpg)
Water Pipeline Project in Karimnagar ,Telanghana
![](https://ymwconstro.com/wp-content/uploads/2015/11/ymw6-600x400.jpg)
Construction & Renovation of Mahavir chowk ,(Baba Petrol Pump )
![](https://ymwconstro.com/wp-content/uploads/2015/11/ymw7-1024x452-1-600x400.jpg)
OPTICAL FIBER CABLE for 60 km. from Aurangabad to Sillod
![](https://ymwconstro.com/wp-content/uploads/2015/11/ymw12-600x400.jpg)
Construction of Cement nala bandhara
![](https://ymwconstro.com/wp-content/uploads/2015/11/ymw-peb-2-600x400.jpg)
PEB(Preengineering Building)
![](https://ymwconstro.com/wp-content/uploads/2015/11/123-600x400.jpg)
Residential Projects
Major Civil Projects Executed under Govt. of Maharashtra for various departments
Sr.No. | Name of Department | Name of Work | Amount in Lakhs | Remark |
---|---|---|---|---|
1 | Nandur Madhmeshwar canal Dn Vaijapur | Construction of E/w and structures of KM 4 to 9 Wanjargaon Br. Of Dy. No. 9 | 243.27 | Work completed |
2 | Nandur Madhmeshwar canal Dn Vaijapur |
Construction of E/w and structures of Dy. No. 5 Km 4 to 5 of N M Canal |
159.11 | Work completed |
3 | Nandur Madhmeshwar canal Dn Vaijapur |
Construction of E/w and structures of Dy. No. 1 Km 1 to 4 Br.Canal No. 1 of N.M. Canal. |
208.57 | Work completed |
4 | Lower Wardha Canal Div. Wardha(Pipri) |
Construction of earthwork and structures nachangaon Minor No.2 Lower Wardha |
210.11 | Work completed |
5 | P.W.D Aurangabad | Construction of Minor Bridge on Beed bypass NH-211, Dist Aurangabad; |
49.32 | Work completed |
6 | P.W.D Aurangabad | Construction of Bridge on Satara to Satara Tanda, Dist Aurangabad. |
54.56 | Work completed |
7 | Nagpur Madhyam Prakalp Div. Nagpur |
Construction of earthwork and structures of wadvihira Minor and subminor of main canal of Jamriver project |
155.22 | Work completed |
8 | Subdivisional Agriculture Office Vaijapur. |
Nala Deeping works for chandgaon,khandala,Gadepimpalgaon |
60.31 | Work completed |
9 | Subdivisional Agriculture Office Vaijapur. |
Works of deep continous contour trench for khandala,Kohli ,Bhingi. |
26 | Work completed |
10 | Subdivisional Agriculture Office Vaijapur |
Works of Farm ponds of different sizes,70 nos | 50 | Work completed |
11 | Subdivisional Agriculture Office Vaijapur |
Works of compartment Bunding at ,Tidi,Savandgaon ,Golwadi Quantity-90000rmt |
25 | Work completed |
12 | Minor Irrigation Aurangabad |
Construction of cement nala Bandh at Vaijapur, Aurangabad. 11nos |
105 | Work completed |
13 | Mahavitaran Aurangabad | Construction of Substation Building at jamgaon, Tal. Gangapur, Aurangabd. |
5 | Work completed |
Major Projects Executed On Sublet Contract
Sr.No. | Name of work | Agency | Department |
---|---|---|---|
1 | Executed road works of Vaijapur –lasur highway project for 15kms. Excavation,embankment /subgrade(quantity- 5 lacks cum.) | Kalthiya Construction | MSRDC |
2 | Executed road works in Nanded –Ardhapur Section for 20km(embankment/subgrade) (quantity- 4 lacks cum.) | Keti Construction | PWD |
3 | Earthwork of Dam at upalkheda in soygaon ,Dist:Aurangabad. (quantity-3.40 lacks cum. | GNI INFRASTRUCTURE | Minor Irrigation |
4 | Executed road earthwork for 10 kms for Bhandara to Rajnandgaon highway. (chattisgarh border). (quantity- 7.5 lacks cum.) | Ashoka Buildcon | NHAI |
5 | Pipeline excavation work on quantity basis in MP ,Khargone, for lift irrigation project. | Megha Engg infra ltd; | NVDA |
6 | Pipeline excavation work on quantity basis in Manor ,dist.Palghar. pipe dia 450mm dia Soft Quantity- 3.4 lac cum (quantity- 6 lacks cum.) | KPTL. | RELIANCE INFRA |
7 | Concrete foundation walls for 300 m in length and sabha hall 5 nos, 200 sqm area of each at Paithan ,Auranbagbad | Real Constro Projects | MJP |
8 | Renovation of Mahavir chowk ,fitting paver blocks and compound wall works. | Satyasaibaba construction | MSRDC |
9 | Pipeline earthwork executed on quantity basis in karimnagar ,Telangana Soft quantity- 2.2 lac cum Hard | Megha Engg infra ltd | Irrigation |
10 | Executed earthwork on quantitu basis for Manair upper Dam in karimnagar district,Telangana Quantity (quantity- 6 lacks cum.) | Shri Venkateshwara infra pvt ltd | rrigation |
11 | Preparation of Embankment /Subgrade with borrow /excavated for construction of Solapur – Dhule Highway Section NH – 211 (Aurangabad – Karodi Road Project AKRP). (quantity- 8 lacks cum.) |
L&T | NHAI |